BIM

Building Information Modelling

TEKKON uses BIM technology to model MEP systems fully in digital form.

It makes design faster, more accurate and fully coordinated — before construction begins.

Model detail (LOD)
300–500
Digital coordination
100%
Integrated systems
6
Software platforms
4

Key benefits of BIM

01

Clash detection

Clash checks in the BIM model find conflicts between architectural, structural and building-services elements in advance.

02

Systems integration

MEP, structural and architectural parts in one BIM model — simpler coordination and workflows.

03

LOD 300–500 detail

Highly detailed BIM models for staged design, construction and later operation.

04

Accurate costs and schedules

Model-based design reduces errors, streamlines the workflow and cuts unnecessary costs.

05

As-built model

An as-built model prepared from the work actually carried out, showing the final state of the building after construction.

06

Team collaboration

Project management on BIM 360, with effective coordination and real-time collaboration between teams in one shared environment.

What we do in BIM

We build complete 3D BIM models of MEP systems in Autodesk Revit, where every element carries the technical information it needs — dimensions, materials, catalogue codes, manufacturer data and maintenance parameters.

With Navisworks we coordinate the systems and run clash detection, finding conflicts between architectural, structural and building-services elements at the design stage — before construction starts. This reduces errors, delays and extra costs.

On BIM 360 / Autodesk Construction Cloud we manage the project workflow, control versions and collaborate as a team in real time. Working in one digital environment improves communication, simplifies information exchange and makes project management more efficient.

What BIM does for your project

BIM lets us find potential problems in the digital model — before they become real delays on site. Early coordination reduces errors, rework and lost time, with a direct positive effect on the schedule and budget.

When the project is complete, the client receives an accurate as-built BIM model that reflects the real state of the building and can be used for maintenance, operation and facility management for many years. Such a model adds value to the asset and makes the building much easier to manage.